The Complex Manufacturing Challenge: Major Expansion Without Halting Production

Food Manufacturing

CAPEX project

Zero downtime

Allied Bakeries required a multi-million-pound redevelopment of their West Bromwich site to significantly increase capacity. This wasn't a minor project; it involved installing a new 20,000-roll-per-hour plant, six 80-tonne flour silos, and a new distribution system, along with a major site reorganisation, including relocating the main entrance.

Case Study In Numbers

Production downtime

0 hours

Live install completed with zero disruption

Roll output capacity

20,000/hr

New line commissioned to 20k rolls per hour.

Project duration

12 months

End‑to‑end delivery on schedule.

Flour silos installed

Six × 80 Tonne

Integrated alongside new distribution live.

Coordinated

100+ Contractors

Phased access with hygiene controls.

Hygienic Flexi‑Wall zone

200m × 50m

Segregation enabled works while baking continued.⁠⁠​

DSCF1070.JPG

The Challenge: seamless execution

The critical challenge was the seamless execution of this extensive installation—a complex manufacturing challenge—without disrupting the bakery's continuous, high-volume operations.

The Risk: Costly Downtime and Compliance Hazards

Integrating a modern production line into a live factory environment carried significant risk. Poor project management and coordination of the nearly 100 contractors on site could easily lead to catastrophic operational downtime, severe logistical chaos, or critical hygiene compromises. Any such misstep would result in a substantial financial cost to the business.

The Solution: Strategic Project Management & Innovative Segregation

Legacy Manufacturing Solutions was appointed as the expert partner, providing end-to-end project management over the full 12-month contract. Our core strategy focused on meticulous planning to ensure seamless execution and zero disruption.

The key innovation was the implementation of a sophisticated "Flexi-Wall" system. We constructed a 200m by 50m hygienically segregated zone within the operating factory. This strategic partitioning allowed major civil works on floors, roofs, and services to proceed safely and at schedule while normal bakery production continued, entirely unaffected.

Our hands-on management team meticulously coordinated every detail—from civil engineering and risk assessment to the final mechanical installation and handover.

We ensured the project adhered to the agreed timeline, stayed within budget, and met the highest health and safety and quality standards.

DSCF1073.JPG

The Outcome: Enhanced Capacity with Zero Disruption

DSCF1130.JPG

The 12-month programme was a decisive success, delivered on time and on budget.

Allied Bakeries now benefits from a state-of-the-art facility with massively increased production capacity. Crucially, this complete industrial Transformation was achieved with zero disruption to their existing operations, completely protecting their revenue and output throughout the project’s duration.

 

This case study is a perfect example of our commitment to delivering complex industrial projects with the precision and intelligence required to achieve a true zero-downtime outcome.

Gemini_Generated_Image_f58b5xf58b5xf58b_edited.jpg

Proven Results. Documented.

We don’t just claim to take the pain out of project delivery; we have the track record to prove it. Download our Industry Impact Pack to see how we’ve delivered for brands like Pepsico, Weetabix, and more. Button: Download All Case Studies

Built on a Foundation of Integrity.

We don’t just claim to be experts; we prove it. Our accreditations are an independent assurance of our commitment to quality management, environmental responsibility, and operational safety on every single site.

Strategy for Your Next Complex Manufacturing Challenge

Do you have a complex manufacturing challenge that requires expert, zero-downtime project management? Contact us today to discuss your project and growth.

20190904_120836.jpg

Projects WE HAVE ALSO Delivered FOR

For heads of engineering delivering CAPEX on time

See how disciplined planning, contractor control, and value engineering protect timelines and budgets.

skid 3.bmp

£1.4m upgrade across 3 lines in 10 days

Three independent pasteurisation systems replaced a failing single plant and were delivered in a fixed 10‑day shutdown, reducing risk, waste, and downtime.

20190429_114802 (2).jpg

Eon × Mueller — 50‑tonne engine install, no downtime

A 2.5 MW on‑site power unit installed over live lines with HV works and a live gas hot‑tap, cutting energy costs and delivering seven‑figure annual savings.

P8100011.JPG

Nestlé Purina — £28m+ line expansion delivered on time

200+ contractors coordinated through an intense 10‑week window, adding capacity, improving efficiency, and securing measurable operational savings.